Can electrical plans be made at the start of a design project?
Clients building a family house often ask us to deliver the electrical plans as early as possible. We understand this wish, because the electrical installation is done almost at the start of construction.
Unfortunately, from the point of view of creating the project, it is exactly the other way round. The final goal of all the work on a design project is to create the documents for implementation, which include the electrical plans. They are prepared in the final part of the project, based on the approved visualizations. In other words, preparing these plans actually completes the project. Let me try to explain why it can’t be done otherwise – for example right after the layout is approved – but only after the style stage.
- The layout does not include wall shelves, decorative panels, pictures and other decorative items that may get in the way of switches and sockets on the walls.
- During the style stage, the dimensions of the furniture may change slightly.
- The position of some electrical appliances can only be determined precisely in the style stage. Every appliance needs its place.
- Lighting plays a big role in decisions about style. Today, lighting scenes are complex, with many light sources on ceilings and walls, decorative furniture lighting, night lighting and so on. Once the lights are placed, we work out how to control them most conveniently. That is why several light sources are often grouped together and can be controlled from different places.
- When clients see their future interior in 3D, it is easier for them to understand how they will live there and what else they might need. As a result, small changes sometimes happen.
- Together with the electrical installation, we plan the positions of internet and TV sockets, water supply, drainage and heating. All this is done in the drawing stage. The systems must correspond with each other and meet regulations.
- In the drawing stage we draw not only floor plans but also wall elevations, so we can make sure everything is placed correctly and nothing overlaps.
- Preparing drawings for implementation is very careful work done after the visualizations are approved, i.e. when the interior is already solved visually. If we try to issue any kind of drawing in advance, it won’t be an accurate drawing but one that will need to be redone later. If it is built from, the work will have to be redone. All this extends the time and increases the price of both the design and the implementation.
The residential architect prepares a plan showing all the lights, sockets and switches, with notes on which electrical appliances they belong to. Based on this, the electrician creates their own plan, calculates the length and thickness of the cables needed and the load for the circuit breakers. A physical cable of the required thickness has to be run to each point, in the required order!
As you can see, there is no other way than to make the electrical drawings at the end of the project. So our best recommendation is to contact us in good time, or to count on the interior design taking some time to prepare.